How long does it take to build an MVP?
It depends what you call an MVP. The real working core takes 2-5 days. A first usable version takes about 14 days. A full build with design, deployment and launch support takes 30-90 days. Most of the difference is scope, not typing speed.
FIXED PRICE · FOUNDER-LED · PRODUCTION CODE
Four stages, four timelines
These are my timelines and fixed prices for UK founders. Other builders will quote differently, so use this as a yardstick.
| Stage | Typical time | What you get | Price |
|---|---|---|---|
| Onion Sprint | 2-5 days | The real working core, live and usable | £1,500 - £2,500 |
| MVP Sprint | 14 days | A basic version with 1-2 core features | £5,000 |
| MVP Strategy | 14-21 days | Roadmap, architecture and a spec to build from. No build. | £3,000 |
| MVP Full Build | 30-90 days | A complete product, basic design, deployment, launch support | From £8,000 |
Details on the build an MVP from scratch page. Prices are covered in how much an MVP costs in the UK.
Six things that stretch an MVP timeline
More features
Every feature adds time, and every feature that talks to another feature adds more than you'd think.
Integrations
Payments, email, calendars, third-party APIs. Each one has its own quirks and its own approval process.
Several user types
Customers, admins and suppliers each need their own screens, permissions and testing.
Mobile app stores
Submission and review add days you don't control, and a rejection sends you back round the loop.
Design polish
A pixel-perfect interface is a lovely thing to have after you know the core works. Before that, it's the shell.
Slow decisions
Waiting three days for an answer on a button costs three days. Most delays are people, not code.
Typing is cheap now. Judgment isn't.
AI tools can generate a working screen in minutes, and that's genuinely useful. It's also why so many founders end up with a product that works in a demo and wobbles with real customers. If that's you, see how to fix a vibe-coded app.
What they haven't sped up is the hard part: deciding what to build first and what can wait. That decision is where a two-year project turns into a two-week one, and it's why I start with the real core.
Six ways to get to launch faster
Pick one user and one job
If you can't say who it's for and what it does for them in a sentence, the scope is still too wide.
Cut to three to five features
Everything else goes on the LATER list. It'll still be there after real users have told you what matters.
Build the core before the shell
The working thing at the centre first. Branding, onboarding and polish after.
Have one decision-maker
Committees add days. One person who can say yes or no keeps it moving.
Use what exists
Don't build login, payments or email from scratch when a proven service does it.
Launch to ten people, not ten thousand
You're after signal, not scale. A small, real group tells you more than a big launch.
MVP timelines, answered
How long does it take to build an MVP?
The real working core takes 2-5 days. A first usable version with one or two features takes about 14 days. A full build with design, deployment and launch support takes 30-90 days. The spread is mostly scope, not typing speed.
Can an MVP really be built in two weeks?
Yes, if it's one or two core features and you accept minimal design. That's what my £5,000 MVP Sprint is. It stops being possible when the scope includes lots of integrations, payments, several user types or a polished design.
How long does it take to build an MVP app?
Allow a little longer than a web MVP. Flutter lets one codebase serve both iOS and Android, which keeps it down, but app store submission and review add days you don't control.
Has AI made building an MVP instant?
AI tools have made writing code much faster. They haven't made deciding what to build faster, and that's where most of the time and money goes. They also tend to produce something that works in a demo, which is not the same as being ready for customers.
What's the fastest way to test an idea?
Often it isn't software at all. A landing page or a poster shows whether anyone wants it for next to nothing. Rome wasn't built in a day covers how.
Related guides
How to hire an MVP developer
Freelancer, agency or founder-led? And the questions to ask first.
Read the guideHow long would yours take?
Tell me what you want to build and I'll give you an honest timeline, and tell you if the answer is 'don't build it yet'.
Darryll Wolloff is the founder of TechConnex. He builds MVPs and fixes AI-built apps for early-stage founders, and still writes and ships production code himself. Last updated 17 November 2026.