MVP pricing

How much does an MVP cost in the UK?

UK agencies typically quote £5,000-£15,000 for a validation prototype and £15,000-£35,000 for a production-ready MVP. A tightly scoped build from me starts at £1,500. Here is what sits behind each number.

FIXED PRICING  ·  PRODUCTION CODE, NOT DEMOS  ·  PRICES AND MARKET FIGURES UPDATED NOVEMBER 2026

The short answer

What an MVP costs in the UK in 2026

Most UK cost guides land in the same place. A validation prototype is roughly £5,000-£15,000. A production-ready MVP is roughly £15,000-£35,000. Anything with payments, several integrations or AI features starts around £35,000, and some guides go to £80,000 and beyond.

MVP typeWhat it usually coversTypical UK agency rangeWhere I fit
Validation / prototypeCore screens, sign-up and simple testing, enough to test an idea with real people£5,000-£15,000Onion Sprint (£1,500-£2,500) or MVP Sprint (£5,000)
Production-ready MVPA standard web or simple SaaS app with real logins and a database£15,000-£35,000MVP Full Build, from £8,000
Complex / multi-platformPayments, several integrations, multi-tenancy or AI features£35,000+ (some guides go to £80,000+)Usually a team job. I'll tell you if so.

Ranges from published UK guides, November 2026: Coderacle (£5,000-£15,000 prototype, £15,000-£35,000 production-ready), GuruSoftwares (£5,000-£25,000 overall) and Foundry 5 (£15,000-£80,000 overall). They don't all agree, so treat the ranges as a guide, not a quote.

My prices sit below those ranges because it is one person, a tightly scoped core and no agency markup. The trade is fewer features, built properly, which is what an MVP should be anyway. If you need a big multi-feature product with a full team, an agency may be the better fit, and I'll tell you if that's the case.

Quick check

Where does your MVP land?

Six questions. It's a rule of thumb for which row of the table you're in, not a quote.

My prices

Four ways to start, four fixed prices

Most founders do not need the biggest number first. These are my fixed prices for MVP development UK, from smallest to largest.

MVP optionWhat you getTimePrice
Onion SprintThe real working core, built as production code2-5 days£1,500-£2,500
MVP StrategyPrioritisation workshop, NOW vs LATER roadmap, architecture and spec14-21 days£3,000
MVP SprintUltra-fast basic version with one or two core features14 days£5,000
MVP Full BuildFull product development, basic UI/UX, deployment, launch support and 30 days of tweaks30-90 daysFrom £8,000

MVP Sprint

14 DAYS

An ultra-fast basic version with one or two core features, for when you need something in users' hands this month.

£5,000Working product in two weeks.

MVP Strategy

14-21 DAYS

A prioritisation workshop, NOW vs LATER roadmap, architecture and a detailed spec, for founders who already have developers.

£3,000You build it, I make sure it's the right thing.

MVP Full Build

30-90 DAYS

Everything in MVP Strategy, plus complete product development, basic UI/UX design, deployment, launch support and 30 days of tweaks.

From £8,000I build it and hand over the keys.
Prototype vs MVP

MVP prototype cost vs real MVP cost

A prototype is a demo built to show an idea. An MVP is a real product with only the features that matter. They get quoted side by side, but they're not the same purchase.

PrototypeReal MVP
What it isA demo to show the idea, often a clickable mock-up or rough buildA working product with only the features that matter
Typical UK agency price£5,000-£15,000£15,000-£35,000
My priceNot something I sellOnion Sprint £1,500-£2,500 or MVP Sprint £5,000
If it worksUsually rebuilt as the real thing, so you pay twiceYou carry on from where it is

A prototype can look cheaper on the quote, but if it works you often pay again to rebuild it properly. The Onion Sprint (£1,500-£2,500) is production code from the start, so there's no second bill to turn a prototype into a product.

Why prices vary

What pushes the cost up

Two MVPs that sound similar can cost very different amounts. These are the things that move the number.

Number of features

Every feature adds build time, testing and things that can break. An MVP with three features costs far less than one with ten, and usually teaches you more.

Payments, accounts and integrations

Logins, roles, payments and third-party connections are where simple ideas get expensive. Build the one you need to test your idea, and leave the rest for later.

Platforms

Web only, or iOS and Android too? Building on cross-platform tools like Flutter and managed back ends like Firebase or Supabase keeps this down.

Design polish

A clean, usable screen is enough to test a core idea. A custom design system is for later, once people are asking for it.

Changing direction mid-build

The most expensive MVPs are rarely the ones with the most features. They are the ones where the idea shifted halfway through. Proving the core first makes that much less likely.

Compliance and data

Anything handling payments, health or sensitive personal data needs more care up front. It's worth knowing early, so it doesn't arrive as a surprise bill.

Cost by feature

FeatureEffect on priceWhy
Logins and accountsSmall to moderateManaged services like Firebase or Supabase make basic sign-up cheap. Roles, teams and permissions are where it grows.
PaymentsLargeTaking a payment is the easy bit. Refunds, failed cards, subscriptions, receipts and tax are the work.
Third-party integrationsModerate, eachDepends on how good the other side's API is. Every one is something that can break.
Admin dashboardModerateFounders forget they need to see and fix their own data. A simple back-office view is usually enough at first.
Native iOS and AndroidLargeTwo app stores and a lot of devices to test. Cross-platform tools like Flutter narrow the gap.
AI featuresModerate to largeCalling a model is cheap. Handling bad answers, data and cost per user is the work.
Custom design systemModerateYou don't need one to test the core. Add it when people ask for it.

Relative effect, not a price list. A real number needs a real scope.

After launch

What an MVP costs once it's live

The build isn't the only bill. Budget for these as well:

  • Hosting and database: typically small at MVP stage, but it grows with users. Check each provider's current pricing.
  • Third-party services: email, SMS, analytics and payment processing fees.
  • App store fees: if you ship a mobile app, Apple and Google both charge for a developer account.
  • Fixes and changes: your first real users will find things you didn't. A Full Build includes 30 days of tweaks. After that, budget for ongoing time.

None of this should come as a surprise. Ask any developer for a list of the recurring costs before you sign anything.

Built with AI tools

What if I build it with Lovable, Bolt or Cursor?

That's a fair way to test an idea cheaply, and for plenty of ideas it's all you need. Our guide to building an app with AI covers how far it gets you.

The cost can sneak in when real users, payments or data arrive. That's when someone needs to check it's secure, that the data is in good shape and that you can ship changes without holding your breath. Sometimes it's all fine. The point is to find out before a customer does.

If you've already built something, the AI Product Readiness Review is a fixed £1,950. If it's already misbehaving, start with fixing a vibe-coded app.

The expensive way

What the expensive way looks like

BetSquad (the precursor to SquadGames) took two years to build. We had the UI. We had the polish. We built multiple features before we ever knew if the core mechanic actually worked. Some of those features survived. A lot didn't.

We don't think the team failed. We think the order failed. We built the shell first, what it should look like and what it should offer, instead of proving the one thing that actually mattered worked.

That is why I start with the core. The Onion Sprint costs a small fraction of a full build, and by the end you either have working code worth building around, or you've learned cheaply that you need to change direction.

The cheapest MVP is the one you did not build the wrong way first.

If you're not sure anyone wants it yet, an even cheaper first step is a poster. Rome wasn't built in a day explains how a market stall, a few posters and a trip to Dudley can show you what's worth building.

Timelines

How long does it take to build an MVP?

It depends on what you mean by MVP. In my experience the useful milestones look like this:

  • 2-5 days: the real core, built and live (Onion Sprint)
  • 14 days: a basic version with one or two core features in users' hands (MVP Sprint)
  • 14-30 days: a first version with real users giving you feedback
  • 30-90 days: a full MVP with design, deployment and launch support (MVP Full Build)

If a quote says six months for a first version, ask what is in it and what could wait.

Common questions

MVP cost FAQ

How much does an MVP cost in the UK?

UK guides typically put a validation prototype at £5,000-£15,000 and a production-ready MVP at £15,000-£35,000, with complex builds starting at £35,000. My fixed prices are lower because it is one person building a tightly scoped core: £1,500-£2,500 for an Onion Sprint, £5,000 for an MVP Sprint, and from £8,000 for a full build.

What does an MVP prototype cost?

Agency guides commonly put a validation prototype at around £5,000-£15,000. My Onion Sprint is £1,500-£2,500 and is real production code rather than a throwaway prototype, so you keep what you pay for.

Can I build an MVP for under £5,000?

Yes. The Onion Sprint is £1,500-2,500 and gets you a working core on production platforms. It is built to be the foundation of the MVP, not thrown away.

What does an MVP cost to run after launch?

Beyond the build, expect hosting and database costs, third-party services such as email and payment processing, app store fees if you ship a mobile app, and time for fixes. At MVP stage running costs are typically small, but they grow with users. A full build includes 30 days of tweaks.

Is it a prototype or real code?

Real code. No mockups and no throwaway demos. If you continue, the sprint becomes the foundation of your MVP. If you don't, you still keep working code.

Is the price fixed?

Yes. Pricing is fixed, so you know the number before we start. There's no agency markup, because you work directly with me.

I've already built something with AI tools. What now?

If it has real users, payments or data, you are past this stage. The AI Product Readiness Review is a fixed-price £1,950 check of whether it can support your next milestone.

Keep reading

Related guides

How long does an MVP take?

From 2-5 days for the core to 90 days for a full build.

Read the guide

How to hire an MVP developer

Freelancer, agency or founder-led? Questions to ask first.

Read the guide

How to build an app with AI

What AI tools get you, and where they run out.

Read the guide

Build an MVP from scratch

The Onion Sprint and the MVP packages.

See the packages
Ready when you are

Not sure which one you need?

Tell me what you're building and I'll tell you honestly which of these fits, including if the answer is "none of them yet".

See the full range on the MVP development UK page.

Darryll Wolloff is the founder of TechConnex. He advises early-stage founders and still writes and ships production code himself. Prices and market figures last updated 26 November 2026.